Inspection readiness · multi-entity
What you are buying: corrective-action packs for every citation across the chain, plus this board: packs in 48 hours, clearance tracking, readiness benchmarks by site type. From $3,500 a month, annual, invoiced by ACH.
Sites flagged now
6 of 10
Median days to clear
23 days
First-pass clear rate
94%
Open items, chain-wide
39
Sites are benchmarked within site type and inspection regime, never across them. A kitchen citation and a warehouse citation clear differently. Young sites get wide intervals and a flag, not a false rank.
TRACKED
Days to clear, first-pass reinspection rate, open-item depth, by site and severity. Every figure carries a confidence interval and its sample size.
NOT TRACKED
Inspections that have not happened yet, and legal outcomes. The pack ends at the reinspection binder; your teams own the physical work.
ENTITY MODEL
Sites are child orgs under the parent; billing attaches to the parent only, by annual ACH invoice. Row-level security keeps siblings invisible to each other, tested in CI.
Annual agreement, invoiced to the parent company, paid by ACH. Priced by sites and inspection volume, not seats.
The estimate below produces a chain-specific range and a link you can forward. The figure on the right is the actual starting price.
Three sliders, one range, a link you can send to your partners. No email required to see the number.
Estimated flag-time exposure avoided, annual, 80% interval
$58,320 to $106,920
Modelled from cutting a typical two-week clear to under five days on failed inspections. It is not a measurement; the pilot replaces it with one.
The link opens this estimate with your inputs, no sign-in. Next step is a 45-minute session with the last two citations from two of your sites.