TelevisedFindings edition

The sewer scope report a buyer can actually read.

The deal, up front: the camera contractor films the line. We turn that footage into the document the deal needs: findings in plain English, severity on a stated scale, stills the buyer can point at, and a cost context section that keeps a $600 root cut from being negotiated like a $16,000 dig.

For home inspectors adding sewer scopes, and the agents who order them. Inside the inspection window, a readable report is the difference between a closed deal and a spooked buyer.

See what page one says

Written for the person holding the offer

Findings, not fear

Every observation says what it is, where it is, and what it means for the next five years. The clean footage gets reported as plainly as the problem, because credibility is the product.

Severity with a definition

The 1 to 5 scale is defined inside the report, in the buyer's copy. Nobody has to trust a number they cannot look up on the same page.

Cost context, carefully

The report brackets what each class of finding typically means for scope of work, and says out loud that repair quotes come from contractors. It informs the negotiation without pretending to be a bid.

The scale, stated

SEV 1 to 2Cosmetic or minor. Note it, monitor it, no action inside the transaction.
SEV 3Serviceable with maintenance. Priced in hundreds. The report says which kind.
SEV 4 to 5Repair indicated. The finding carries the still, the distance and the depth estimate a contractor needs to quote it sight unseen.

Scale defined per report. Not affiliated with any certification body's coding standard.

Proposed pilot price

$55 per report, both versions included

Inspector copy and buyer copy, delivered by 8 am from footage uploaded the evening before. Rush inside the inspection window, $95.

Proposed pricing for a pilot. This option is not yet on sale, see the status note below.

Where this sits in the plan: the weighted scorecard ranks sewer-camera reports tenth of ten, overall 3.29, decision: technically heavier. Queued behind the launch trio. This page is one of three design directions for that later test. See the scorecard and the roll-out plan.