ClearedEVIDENCE

The reinspector wants proof. Frame it for them.

The deal, up front: a failed inspection is an evidence problem. The pack gives every violation its code, its fix, and a slot for the photo that proves the fix. Reinspections stop being conversations and become page turns.

For facilities directors and chain operators juggling open violations at a dozen sites. The board below tells you which site's clock is costing the most.

Three exhibits from a sample pack

CRITICAL

V-02 · CODE CITED BY INSPECTOR

Blocked egress, storage in corridor

Fix: clear and mark the corridor, photograph from both ends. Sequenced first because critical items gate the reinspection booking.

STANDARD

V-05 · CODE CITED BY INSPECTOR

Extinguisher tag out of date

Fix: service by a licensed company, tag photographed. The pack lists the trade needed, never performs it.

CLEARED

V-07 · EVIDENCE ATTACHED

Hand sink restored

Timestamped photo in the slot, exhibit closed. Cleared items stay in the pack so the reinspector sees the whole story in order.

# Demonstration exhibits. Violations and codes vary by jurisdiction; the pack quotes the inspector's own citations and adds nothing to them.

How a report becomes a pack

Report uploaded from any site, any inspection type5 min
Pack back with fixes sequenced and evidence slots48 hours
Site manager fills photo slots from a phoneas fixed
Portfolio board: open violations by site, by days openalways current

# The 48 hour turnaround is the service standard, refunded when missed.

Price, per the locked decisions

Per pack, one report, any site$750
Portfolio board across all sitesincluded
Subscription, contracts, minimumsnone

# One-time card product per the roll-out plan's locked table. Cleared is sold on time-to-clear, and its weak retention score is priced in, not hidden.

Where this sits in the plan: Cleared ranks fifth of ten, overall 3.62, best speed of the launch five at 4.25, weakest retention at 2.00. This page is one of its design directions, built in the Reel system the owner selected. See the scorecard and the roll-out plan.